This is for control of flooding, runoff and other drainage projects as identified in the City's Master Drainage Plan. Four project areas were identified.
Project Area 1 - West Goforth Road (Fire Station) and Bluff Street Area
The general scope of work for this project includes:
- Channel Improvements and culvert upgrades along W. Goforth and Union Pacific Railroad Track
- Flood diversion (relief) channel from unnamed tributary to Onion Creek
- Box culverts at Jack C. Hays Trail (FM 967)
Project Area 2 - Houston Street Area
The general scope of work for this project includes:
- Channel Improvements and culvert upgrades along Houston St., Railroad St., and main channel
- New storm drain inlets at Houston St. and Rose St.
Project Area 3 - Oxbow Neighborhood Area
The general scope of work for this project includes:
- Channel Improvements and culvert upgrades along main channel
Project Area 4 - Lifschutz Headwaters Area
The general scope of work for this project includes:
- Voluntary Buyouts proposed
- 3 Manufactured homes on 1/2 acre lots